Suspended ceilings and insulation – Vila-sacra (Girona)
FIARCÓN delivered
FIARCÓN was the contractor responsible for the drywall and insulation works, installing more than 200 m² of plasterboard ceilings at heights of over 6 metres, with particularly demanding access and installation conditions.
Work carried out
More than 200 m² of plasterboard ceilings, including areas with a double pitch, fibre blanket thermal insulation and approximately 80 m² of ceiling bulkheads, adapting the systems to the geometry and height of the building.
Project delivery
The work was completed in just 6 days by a team of 2 operatives, keeping a high pace despite working at over 6 metres in height and the complexity of the ceiling junctions and pitches.
Result
More than 200 m² of insulated ceilings and approximately 80 m² of bulkheads completed, ready for the next phases of the works and in line with the planned schedule.